PUBLIC INFORMATIONAL MEETING

**E.ON has scheduled a public meeting at North Posey High School on 6/26 at 6pm**

presentations from 6 to 8, with Q/A following in the foyer

Industrial Wind Turbines
in Posey and Gibson
County concern us all.

Our goal is to inform our neighbors and fellow county residents about the issues of

Safety, Property Rights, Health, and Property Values regarding industrial wind turbines in Posey County.

shutterstock_1044578155.jpg

Resources

Setback Information

  1. Setback Distance Study (PDF)
    School of Aerospace Engineering, Georgia Institute of Technology and the School of Mechanical and Aerospace Engineering, University of Alabama in Huntsville

  2. Setback Distance Study – Larwood 2018 (PDF)
    Department of Mechanical Engineering, University of the Pacific, Stockton, California, and The National Wind Technology Center, National Renewable Energy Laboratory, Golden, Colorado

  3. Article – Paul Crowe: “Calculating Wind Turbine Setbacks With Science Instead of Politics” (PDF)

  4. Vestas (Manufacturer of turbine) manual requiring 1640 ft. setback





 
image.png

Petition

 

About Us

We are residents of Gibson County who support safe and responsible wind energy.

Our goal is to inform our neighbors and fellow county residents about the issues of Safety, Property Rights, Health, and Property Values regarding industrial wind turbines in Gibson County.

 
home-p1423857195-6-2500x1500.jpg